Deep dives on capacity, surge, inverter derate, 240V, transfer switches, and how GridMatch calculators score units.
A large wattage number on a battery does not prove it can run a well pump. The system must produce true 120/240V split-phase power, start the pump motor, and connect through approved transfer equipment that cannot backfeed the utility.